{"id":6633,"date":"2026-11-03T14:01:59","date_gmt":"2026-11-03T06:01:59","guid":{"rendered":"https:\/\/www.airbag.cc\/bridge-protection-engineering\/cross-sea-bridge-anti-collision-system\/"},"modified":"2026-11-03T14:01:59","modified_gmt":"2026-11-03T06:01:59","slug":"cross-sea-bridge-anti-collision-system","status":"publish","type":"page","link":"https:\/\/www.airbag.cc\/ru\/bridge-protection-engineering\/cross-sea-bridge-anti-collision-system\/","title":{"rendered":"Cross-Sea Bridge Vessel Anti-Collision Systems"},"content":{"rendered":"<div class=\"nb-landing\">\n  <section class=\"nb-hero\" aria-labelledby=\"nb-hero-title\">\n    <div class=\"nb-hero__grid\" aria-hidden=\"true\"><\/div>\n    <div class=\"nb-container nb-hero__inner\">\n      <nav class=\"nb-breadcrumbs\" aria-label=\"\u0425\u043b\u0435\u0431\u043d\u0430\u044f \u043a\u0440\u043e\u0448\u043a\u0430\">\n        <a href=\"https:\/\/www.airbag.cc\/ru\/\">\u0414\u043e\u043c<\/a><span aria-hidden=\"true\">\/<\/span>\n        <a href=\"https:\/\/www.airbag.cc\/ru\/bridge-protection-engineering\/\">\u0418\u043d\u0436\u0435\u043d\u0435\u0440\u043d\u0430\u044f \u0437\u0430\u0449\u0438\u0442\u0430 \u043c\u043e\u0441\u0442\u043e\u0432<\/a><span aria-hidden=\"true\">\/<\/span>\n        <span aria-current=\"page\">Cross-Sea Bridge Anti-Collision<\/span>\n      <\/nav>\n\n      <div class=\"nb-hero__layout\">\n        <div class=\"nb-hero__copy\">\n          <p class=\"nb-eyebrow\"><span><\/span> Vessel anti-collision engineering<\/p>\n          <h1 id=\"nb-hero-title\">Cross-Sea Bridge Vessel Anti-Collision Systems<\/h1>\n          <p class=\"nb-hero__lead\">Tiered flexible protection for 100,000-DWT navigation channels, non-navigable approach spans and artificial-island transitions.<\/p>\n          <p class=\"nb-hero__support\">A full-watershed architecture combining floating composite structures, multi-stage energy absorption and intelligent submerged interception.<\/p>\n\n          <div class=\"nb-hero__actions\">\n            <a class=\"nb-button nb-button--primary\" href=\"#project-consultation\">Request project sizing <span aria-hidden=\"true\">\u2192<\/span><\/a>\n            <a class=\"nb-button nb-button--ghost\" href=\"#engineering-case\">Review the HZMB case<\/a>\n          <\/div>\n\n          <ul class=\"nb-hero__trust\" aria-label=\"Technical highlights\">\n            <li>HZMB 55-km reference<\/li>\n            <li>ISO 17357-1 airbag stage<\/li>\n            <li>Project-specific simulation<\/li>\n          <\/ul>\n        <\/div>\n\n        <figure class=\"nb-hero__media\">\n          <div class=\"nb-hero__image-wrap\">\n            <img src=\"https:\/\/www.airbag.cc\/wp-content\/plugins\/nanhai-bridge-landing\/assets\/nanhai-bridge-prevention.webp\" alt=\"500-ton vessel held by NANHAI MARINE floating pneumatic airbag interception chain during a full-scale trial\" width=\"1280\" height=\"959\" fetchpriority=\"high\" decoding=\"async\">\n            <figcaption>\n              <span>Full-scale field validation<\/span>\n              <strong>500 t vessel \u00b7 7 kn interception trial<\/strong>\n            <\/figcaption>\n          <\/div>\n          <div class=\"nb-hero__badge\" aria-hidden=\"true\">\n            <strong>55\u201375%<\/strong>\n            <span>documented peak-force reduction*<\/span>\n          <\/div>\n        <\/figure>\n      <\/div>\n\n      <div class=\"nb-metrics\" aria-label=\"Key engineering performance benchmarks\">\n        <div class=\"nb-metric\">\n          <span class=\"nb-metric__value\">100,000 DWT<\/span>\n          <span class=\"nb-metric__label\">Main-channel design vessel<\/span>\n        <\/div>\n        <div class=\"nb-metric\">\n          <span class=\"nb-metric__value\">+40%<\/span>\n          <span class=\"nb-metric__label\">Volumetric energy efficiency*<\/span>\n        <\/div>\n        <div class=\"nb-metric\">\n          <span class=\"nb-metric__value\">&gt;20 years<\/span>\n          <span class=\"nb-metric__label\">Reported marine service life*<\/span>\n        <\/div>\n        <div class=\"nb-metric\">\n          <span class=\"nb-metric__value\">3 tiers<\/span>\n          <span class=\"nb-metric__label\">Main channel \u00b7 approach \u00b7 transition<\/span>\n        <\/div>\n      <\/div>\n    <\/div>\n  <\/section>\n\n  <section class=\"nb-section nb-problem\" aria-labelledby=\"nb-problem-title\">\n    <div class=\"nb-container\">\n      <div class=\"nb-section-heading nb-section-heading--split\">\n        <div>\n          <p class=\"nb-eyebrow nb-eyebrow--dark\"><span><\/span> Why conventional protection falls short<\/p>\n          <h2 id=\"nb-problem-title\">The bridge is protected. The vessel is not always considered.<\/h2>\n        <\/div>\n        <p>A hard barrier can transfer an abrupt force spike into the pier while damaging the hull and crew. A compliant system must do three jobs at once: protect the structure, preserve the vessel and keep the waterway operating.<\/p>\n      <\/div>\n\n      <div class=\"nb-risk-grid\">\n        <article class=\"nb-risk-card\">\n          <span class=\"nb-risk-card__number\">01<\/span>\n          <h3>Higher kinetic energy<\/h3>\n          <p>Larger design vessels and off-axis impacts increase the energy that must be dissipated without allowing mechanical bottoming-out.<\/p>\n        <\/article>\n        <article class=\"nb-risk-card\">\n          <span class=\"nb-risk-card__number\">02<\/span>\n          <h3>Splash-zone corrosion<\/h3>\n          <p>Salt spray, UV exposure and wet\u2013dry cycling can shorten the useful life of conventional steel protection and drive repeated overhauls.<\/p>\n        <\/article>\n        <article class=\"nb-risk-card\">\n          <span class=\"nb-risk-card__number\">03<\/span>\n          <h3>Complex bridge geometry<\/h3>\n          <p>Main-channel piers, slender approach columns and irregular island pile caps require different protection strategies and interfaces.<\/p>\n        <\/article>\n        <article class=\"nb-risk-card\">\n          <span class=\"nb-risk-card__number\">04<\/span>\n          <h3>No channel shutdown<\/h3>\n          <p>Installation and replacement must respect active navigation, tidal windows, marine access and environmental controls.<\/p>\n        <\/article>\n      <\/div>\n\n      <div class=\"nb-objectives\">\n        <div class=\"nb-objective\">\n          <span class=\"nb-objective__icon\" aria-hidden=\"true\">01<\/span>\n          <div><strong>Protect the bridge<\/strong><span>Cap the force transmitted into the pier and foundation.<\/span><\/div>\n        <\/div>\n        <div class=\"nb-objective\">\n          <span class=\"nb-objective__icon\" aria-hidden=\"true\">02<\/span>\n          <div><strong>Protect the vessel<\/strong><span>Extend impact duration and reduce local hull pressure.<\/span><\/div>\n        <\/div>\n        <div class=\"nb-objective\">\n          <span class=\"nb-objective__icon\" aria-hidden=\"true\">03<\/span>\n          <div><strong>Protect continuity<\/strong><span>Support modular installation, inspection and replacement.<\/span><\/div>\n        <\/div>\n      <\/div>\n    <\/div>\n  <\/section>\n\n  <section id=\"solution\" class=\"nb-section nb-solution\" aria-labelledby=\"nb-solution-title\">\n    <div class=\"nb-container\">\n      <div class=\"nb-section-heading\">\n        <p class=\"nb-eyebrow nb-eyebrow--dark\"><span><\/span> Full-watershed architecture<\/p>\n        <h2 id=\"nb-solution-title\">One bridge. Three protection environments.<\/h2>\n        <p>Rather than applying one standard fender to every pier, the protection strategy follows the vessel envelope, water depth, structural geometry and consequence of failure at each bridge section.<\/p>\n      <\/div>\n\n      <div class=\"nb-tier-grid\">\n        <article class=\"nb-tier-card nb-tier-card--featured\">\n          <div class=\"nb-tier-card__top\">\n            <span class=\"nb-tier-card__tag\">Tier 01<\/span>\n            <span class=\"nb-tier-card__range\">50,000\u2013100,000 DWT<\/span>\n          <\/div>\n          <h3>Main navigation channel<\/h3>\n          <p>Heavy-duty composite floating units form a continuous 360\u00b0 protection ring around high-consequence bridge piers.<\/p>\n          <ul class=\"nb-check-list\">\n            <li>Self-floating body follows tidal elevation<\/li>\n            <li>Outer elastomer shell, pneumatic buffer and closed-cell core<\/li>\n            <li>Individual modules can be released and replaced<\/li>\n            <li>Contoured geometry helps redirect oblique impacts<\/li>\n          <\/ul>\n        <\/article>\n\n        <article class=\"nb-tier-card\">\n          <div class=\"nb-tier-card__top\">\n            <span class=\"nb-tier-card__tag\">Tier 02<\/span>\n            <span class=\"nb-tier-card__range\">Approach spans<\/span>\n          <\/div>\n          <h3>Non-navigable spans<\/h3>\n          <p>A dual-layer strategy combines pier-mounted flexible units with an active barrier ahead of vulnerable low-clearance spans.<\/p>\n          <ul class=\"nb-check-list\">\n            <li>Lightweight floating fenders at the pier perimeter<\/li>\n            <li>100m+ surfacing airbag interception chain<\/li>\n            <li>Adaptive cylinders and bow-wrapping net<\/li>\n            <li>Progressive \u201czipper\u201d brake-rope dissipation<\/li>\n          <\/ul>\n        <\/article>\n\n        <article class=\"nb-tier-card\">\n          <div class=\"nb-tier-card__top\">\n            <span class=\"nb-tier-card__tag\">Tier 03<\/span>\n            <span class=\"nb-tier-card__range\">Transitions<\/span>\n          <\/div>\n          <h3>Artificial islands &amp; pile caps<\/h3>\n          <p>Custom-moulded units fit irregular, stepped or flared concrete contours that standard cylindrical fenders cannot follow.<\/p>\n          <ul class=\"nb-check-list\">\n            <li>1:1 geometry developed from site survey<\/li>\n            <li>Retro-reflective warning surfaces available<\/li>\n            <li>Designed around local tidal range and access<\/li>\n            <li>Factory-balanced modules for marine handling<\/li>\n          <\/ul>\n        <\/article>\n      <\/div>\n\n      <div class=\"nb-inline-cta\">\n        <div>\n          <strong>Need to match protection to a specific pier type?<\/strong>\n          <span>Share the design vessel, speed, pier geometry and tidal range for a preliminary review.<\/span>\n        <\/div>\n        <a href=\"#project-consultation\">Send project parameters <span aria-hidden=\"true\">\u2192<\/span><\/a>\n      <\/div>\n    <\/div>\n  <\/section>\n\n  <section class=\"nb-section nb-technology\" aria-labelledby=\"nb-technology-title\">\n    <div class=\"nb-container nb-technology__layout\">\n      <div class=\"nb-technology__intro\">\n        <p class=\"nb-eyebrow\"><span><\/span> How the energy is managed<\/p>\n        <h2 id=\"nb-technology-title\">A force\u2013deflection curve engineered to avoid the spike.<\/h2>\n        <p>Three mechanically distinct stages work in series to create a smoother, broader force plateau and reduce the peak reaction delivered to the bridge.<\/p>\n        <a class=\"nb-text-link\" href=\"#technical-data\">See the documented material data <span aria-hidden=\"true\">\u2192<\/span><\/a>\n      <\/div>\n\n      <ol class=\"nb-stage-list\">\n        <li class=\"nb-stage\">\n          <span class=\"nb-stage__index\">Stage 01<\/span>\n          <div>\n            <h3>Elastomer shell deformation<\/h3>\n            <p>Compliant surface deformation distributes contact pressure, cushions low-energy impacts and starts oblique-vessel redirection.<\/p>\n          <\/div>\n        <\/li>\n        <li class=\"nb-stage\">\n          <span class=\"nb-stage__index\">Stage 02<\/span>\n          <div>\n            <h3>Pneumatic airbag compression<\/h3>\n            <p>Internal cord-reinforced airbags provide a progressive, non-linear stiffness curve and high elastic rebound through long compression strokes.<\/p>\n          <\/div>\n        <\/li>\n        <li class=\"nb-stage\">\n          <span class=\"nb-stage__index\">Stage 03<\/span>\n          <div>\n            <h3>Closed-cell core dissipation<\/h3>\n            <p>At extreme impact, controlled cell-wall buckling and densification absorb megajoule-scale energy over a flat stress plateau.<\/p>\n          <\/div>\n        <\/li>\n      <\/ol>\n    <\/div>\n  <\/section>\n\n  <section class=\"nb-section nb-interception\" aria-labelledby=\"nb-interception-title\">\n    <div class=\"nb-container\">\n      <div class=\"nb-interception__panel\">\n        <div class=\"nb-interception__copy\">\n          <p class=\"nb-eyebrow\"><span><\/span> Beyond the pier ring<\/p>\n          <h2 id=\"nb-interception-title\">An outer defence line for errant vessels.<\/h2>\n          <p>Where a vessel can drift toward a low-clearance approach span, the intelligent submerged interception system creates a flexible barrier before bridge contact.<\/p>\n          <div class=\"nb-interception__steps\">\n            <div><span>01<\/span><strong>\u041f\u043e\u0432\u0435\u0440\u0445\u043d\u043e\u0441\u0442\u044c<\/strong><p>A 100m+ airbag chain rises across the vessel path.<\/p><\/div>\n            <div><span>02<\/span><strong>Capture<\/strong><p>Adaptive cylinders flip and deploy a bow-wrapping net.<\/p><\/div>\n            <div><span>03<\/span><strong>Dissipate<\/strong><p>Brake tethers release progressively to extend stopping distance.<\/p><\/div>\n          <\/div>\n        <\/div>\n        <div class=\"nb-interception__figure\">\n          <img src=\"https:\/\/www.airbag.cc\/wp-content\/plugins\/nanhai-bridge-landing\/assets\/hzmb-field-validation-right.webp\" alt=\"Floating interception modules and positioning buoy during HZMB field validation\" width=\"978\" height=\"491\" loading=\"lazy\" decoding=\"async\">\n          <span>Field validation imagery \u00b7 HZMB reference<\/span>\n        <\/div>\n      <\/div>\n    <\/div>\n  <\/section>\n\n  <section id=\"technical-data\" class=\"nb-section nb-data\" aria-labelledby=\"nb-data-title\">\n    <div class=\"nb-container\">\n      <div class=\"nb-section-heading nb-section-heading--split\">\n        <div>\n          <p class=\"nb-eyebrow nb-eyebrow--dark\"><span><\/span> Material &amp; engineering data<\/p>\n          <h2 id=\"nb-data-title\">Evidence that can enter the technical discussion.<\/h2>\n        <\/div>\n        <p>Documented performance provides a starting point for tender review. Final material grades, energy capacity and compliance are confirmed for the project\u2019s design basis.<\/p>\n      <\/div>\n\n      <div class=\"nb-data-layout\">\n        <div class=\"nb-spec-table-wrap\">\n          <table class=\"nb-spec-table\">\n            <caption class=\"nb-sr-only\">Documented material and mechanical performance<\/caption>\n            <thead>\n              <tr><th scope=\"col\">Property<\/th><th scope=\"col\">Test reference<\/th><th scope=\"col\">Documented performance<\/th><\/tr>\n            <\/thead>\n            <tbody>\n              <tr><td data-label=\"Property\">Outer rubber tensile strength<\/td><td data-label=\"Test reference\">ISO 37 \/ ASTM D412<\/td><td data-label=\"Documented performance\">\u226522.5 MPa, \u226585% post-age retention<\/td><\/tr>\n              <tr><td data-label=\"Property\">Elongation at break<\/td><td data-label=\"Test reference\">ISO 37 \/ ASTM D412<\/td><td data-label=\"Documented performance\">\u2265520%<\/td><\/tr>\n              <tr><td data-label=\"Property\">Compression rebound<\/td><td data-label=\"Test reference\">\u0418\u0421\u041e 17357-1:2014<\/td><td data-label=\"Documented performance\">\u226597.5% after cyclic 60% deflection<\/td><\/tr>\n              <tr><td data-label=\"Property\">Closed-cell water absorption<\/td><td data-label=\"Test reference\">ISO 2896 \/ ASTM D2842<\/td><td data-label=\"Documented performance\">&lt;0.8% by volume<\/td><\/tr>\n              <tr><td data-label=\"Property\">Ozone \/ UV salt-spray resistance<\/td><td data-label=\"Test reference\">ISO 1431-1 \/ ASTM B117<\/td><td data-label=\"Documented performance\">No micro-cracking at 100 pphm \/ 168 h<\/td><\/tr>\n              <tr><td data-label=\"Property\">Reported marine service life<\/td><td data-label=\"Test reference\">Accelerated-age assessment<\/td><td data-label=\"Documented performance\">&gt;20 years in subtropical splash zones*<\/td><\/tr>\n            <\/tbody>\n          <\/table>\n        <\/div>\n\n        <aside class=\"nb-standards\">\n          <span class=\"nb-standards__label\">Design references<\/span>\n          <ul>\n            <li>AASHTO LRFD<\/li>\n            <li>EN 1991-1-7<\/li>\n            <li>PIANC guidance<\/li>\n            <li>JTG D60<\/li>\n            <li>\u0418\u0421\u041e 17357-1:2014<\/li>\n          <\/ul>\n          <p>Applicable edition, local authority requirements and acceptance criteria are confirmed for every project.<\/p>\n        <\/aside>\n      <\/div>\n\n      <p class=\"nb-footnote\">* Performance figures are drawn from NANHAI MARINE technical documentation and specific full-scale test or accelerated-age programmes. They are not a guarantee for every site. Final capacity, dimensions, material selection and compliance are established through project-specific engineering.<\/p>\n    <\/div>\n  <\/section>\n\n  <section id=\"engineering-case\" class=\"nb-section nb-case\" aria-labelledby=\"nb-case-title\">\n    <div class=\"nb-container\">\n      <div class=\"nb-case__header\">\n        <div>\n          <p class=\"nb-eyebrow\"><span><\/span> Flagship engineering reference<\/p>\n          <h2 id=\"nb-case-title\">Hong Kong\u2013Zhuhai\u2013Macao Bridge<\/h2>\n          <p>A 55-km cross-sea crossing through the Lingdingyang estuary, combining three navigation channels, more than 20 km of approach spans, two artificial islands and strict marine-operating constraints.<\/p>\n        <\/div>\n        <div class=\"nb-case__metrics\">\n          <div><strong>55 km<\/strong><span>Crossing length<\/span><\/div>\n          <div><strong>100,000 DWT<\/strong><span>Design-vessel capacity<\/span><\/div>\n          <div><strong>4,000+<\/strong><span>Daily vessel movements<\/span><\/div>\n          <div><strong>12<\/strong><span>Full-scale impact runs*<\/span><\/div>\n        <\/div>\n      <\/div>\n\n      <div class=\"nb-case__gallery\">\n        <figure>\n          <img src=\"https:\/\/www.airbag.cc\/wp-content\/plugins\/nanhai-bridge-landing\/assets\/hzmb-field-validation-left.webp\" alt=\"Aerial view of vessel interception trial with floating airbag chain and positioning buoys\" width=\"976\" height=\"491\" loading=\"lazy\" decoding=\"async\">\n          <figcaption>Full-scale vessel approach and flexible interception-chain response.<\/figcaption>\n        <\/figure>\n        <figure>\n          <img src=\"https:\/\/www.airbag.cc\/wp-content\/plugins\/nanhai-bridge-landing\/assets\/hzmb-field-validation-right.webp\" alt=\"Sea-level view of HZMB field validation modules\" width=\"978\" height=\"491\" loading=\"lazy\" decoding=\"async\">\n          <figcaption>Terminal buoy, floating modules and progressive brake-rope engagement.<\/figcaption>\n        <\/figure>\n      <\/div>\n\n      <div class=\"nb-case__details\">\n        <div>\n          <span class=\"nb-case__label\">Coverage logic<\/span>\n          <p>Main navigation channels \u00b7 non-navigable approach spans \u00b7 artificial-island transition pile caps.<\/p>\n        <\/div>\n        <div>\n          <span class=\"nb-case__label\">Engineering response<\/span>\n          <p>Section-specific geometry, floating tidal compensation, staged energy absorption and modular marine replacement.<\/p>\n        <\/div>\n        <div>\n          <span class=\"nb-case__label\">Test objective<\/span>\n          <p>Evaluate vessel capture and controlled deceleration without relying on rigid impact against the bridge structure.<\/p>\n        <\/div>\n      <\/div>\n\n      <div class=\"nb-project-strip\">\n        <span>Additional references reported in the technical white paper<\/span>\n        <div><strong>Zhoudai Bridge<\/strong> 183 floating modules<\/div>\n        <div><strong>Changtai Yangtze River Bridge<\/strong> 36 D3.5m units<\/div>\n        <div><strong>Nansha Bridge<\/strong> bridge protection application<\/div>\n      <\/div>\n    <\/div>\n  <\/section>\n\n  <section class=\"nb-section nb-process\" aria-labelledby=\"nb-process-title\">\n    <div class=\"nb-container\">\n      <div class=\"nb-section-heading\">\n        <p class=\"nb-eyebrow nb-eyebrow--dark\"><span><\/span> From design inputs to marine installation<\/p>\n        <h2 id=\"nb-process-title\">A project path built around the bridge, not a catalogue size.<\/h2>\n      <\/div>\n      <ol class=\"nb-process-grid\">\n        <li><span>01<\/span><h3>\u041e\u043f\u0440\u0435\u0434\u0435\u043b\u0438\u0442\u0435<\/h3><p>Design vessel, speed, impact angle, pier geometry, bathymetry, tide and governing standard.<\/p><\/li>\n        <li><span>02<\/span><h3>Simulate<\/h3><p>Concept sizing and coupled impact analysis to review force, stroke and energy balance.<\/p><\/li>\n        <li><span>03<\/span><h3>Engineer<\/h3><p>Material selection, internal structure, mooring interface and custom mould design.<\/p><\/li>\n        <li><span>04<\/span><h3>Fabricate<\/h3><p>Factory assembly, balancing, quality records and preparation for marine transport.<\/p><\/li>\n        <li><span>05<\/span><h3>\u041f\u043e\u0434\u0434\u0435\u0440\u0436\u043a\u0430<\/h3><p>Installation method, inspection points and individual module replacement planning.<\/p><\/li>\n      <\/ol>\n    <\/div>\n  <\/section>\n\n  <section class=\"nb-section nb-faq\" aria-labelledby=\"nb-faq-title\">\n    <div class=\"nb-container nb-faq__layout\">\n      <div class=\"nb-faq__intro\">\n        <p class=\"nb-eyebrow nb-eyebrow--dark\"><span><\/span> Project questions<\/p>\n        <h2 id=\"nb-faq-title\">What engineering teams usually ask first.<\/h2>\n        <p>If your question depends on the bridge geometry or vessel envelope, include it in the project form and the team can respond against your case.<\/p>\n        <a class=\"nb-text-link\" href=\"#project-consultation\">Ask an engineering question <span aria-hidden=\"true\">\u2192<\/span><\/a>\n      <\/div>\n      <div class=\"nb-faq__list\">\n        <details>\n          <summary>Can the system protect bridges against 100,000 DWT vessels?<\/summary>\n          <p>Main-channel systems are sized around the project design vessel, transit speed and impact angle. The HZMB reference application documented a 100,000 DWT design-vessel capacity and a tiered architecture for navigable channels, approach spans and artificial-island transitions.<\/p>\n        <\/details>\n        <details>\n          <summary>What information is needed for preliminary sizing?<\/summary>\n          <p>Useful inputs include design-vessel DWT and speed, pier geometry, water depth and bathymetry, tidal range, channel clearances, impact assumptions and the governing design standard.<\/p>\n        <\/details>\n        <details>\n          <summary>Is this simply a larger rubber fender?<\/summary>\n          <p>No. The system combines a floating structural body, a multi-stage energy-absorbing core and project-specific mooring or interception components. It can be configured as a 360-degree pier ring, an approach-span barrier or a custom transition-zone unit.<\/p>\n        <\/details>\n        <details>\n          <summary>What standards are used as design references?<\/summary>\n          <p>Project discussions can reference AASHTO LRFD, EN 1991-1-7, PIANC guidance, JTG D60 and ISO 17357-1. The final design basis is confirmed against the tender and local authority requirements for each project.<\/p>\n        <\/details>\n        <details>\n          <summary>Can modules be replaced without closing the navigation channel?<\/summary>\n          <p>The protection units use modular, factory-balanced construction intended for individual replacement. The final installation and replacement method is agreed with the bridge owner, port authority and marine contractor.<\/p>\n        <\/details>\n        <details>\n          <summary>How can I receive the technical white paper?<\/summary>\n          <p>Submit the project consultation form on this page with your work email, company and application. The team will follow up with the technical white paper and, where relevant, a preliminary sizing discussion.<\/p>\n        <\/details>\n      <\/div>\n    <\/div>\n  <\/section>\n\n  <section id=\"project-consultation\" class=\"nb-section nb-contact\" aria-labelledby=\"nb-contact-title\">\n    <div class=\"nb-container nb-contact__layout\">\n      <div class=\"nb-contact__copy\">\n        <p class=\"nb-eyebrow\"><span><\/span> Request technical review<\/p>\n        <h2 id=\"nb-contact-title\">Start with the vessel and the pier.<\/h2>\n        <p>Share the project context below to request the white paper and a preliminary discussion on protection architecture, sizing inputs and next steps.<\/p>\n\n        <div class=\"nb-contact__checklist\">\n          <div><span aria-hidden=\"true\">\u2713<\/span> Design-vessel DWT and speed<\/div>\n          <div><span aria-hidden=\"true\">\u2713<\/span> Pier type and water depth<\/div>\n          <div><span aria-hidden=\"true\">\u2713<\/span> Tidal range and clearances<\/div>\n          <div><span aria-hidden=\"true\">\u2713<\/span> Applicable standard or tender basis<\/div>\n        <\/div>\n\n        <div class=\"nb-contact__direct\">\n          <span>Prefer email?<\/span>\n          <a href=\"mailto:info@airbag.cc\">info@airbag.cc<\/a>\n          <a href=\"tel:+8653188723323\">+86 531 8872 3323<\/a>\n        <\/div>\n      <\/div>\n\n      <div class=\"nb-contact__form\">\n        <div class=\"nb-form-heading\">\n          <strong>Project consultation<\/strong>\n          <span>Fields marked * are required.<\/span>\n        <\/div>\n        <div class=\"nb-form-shell\">\n<div class=\"wpcf7 no-js\" id=\"wpcf7-f75-o1\" lang=\"en-US\" dir=\"ltr\" data-wpcf7-id=\"75\">\n<div class=\"screen-reader-response\"><p role=\"status\" aria-live=\"polite\" aria-atomic=\"true\"><\/p> <ul><\/ul><\/div>\n<form action=\"\/ru\/wp-json\/wp\/v2\/pages\/6633#wpcf7-f75-o1\" method=\"post\" class=\"wpcf7-form init\" aria-label=\"Contact form\" novalidate=\"novalidate\" data-status=\"init\" data-trp-original-action=\"\/ru\/wp-json\/wp\/v2\/pages\/6633#wpcf7-f75-o1\">\n<fieldset class=\"hidden-fields-container\"><input type=\"hidden\" name=\"_wpcf7\" value=\"75\" \/><input type=\"hidden\" name=\"_wpcf7_version\" value=\"6.1.7\" \/><input type=\"hidden\" name=\"_wpcf7_locale\" value=\"en_US\" \/><input type=\"hidden\" name=\"_wpcf7_unit_tag\" value=\"wpcf7-f75-o1\" \/><input type=\"hidden\" name=\"_wpcf7_container_post\" value=\"0\" \/><input type=\"hidden\" name=\"_wpcf7_posted_data_hash\" value=\"\" \/><input type=\"hidden\" name=\"nanhai_hp_check\" value=\"\" \/><input type=\"hidden\" name=\"nanhai_ts\" value=\"1795283301\" \/>\n<\/fieldset>\n<div class=\"column one-second\">\n\t<p><span class=\"wpcf7-form-control-wrap\" data-name=\"your-name\"><input size=\"40\" maxlength=\"400\" class=\"wpcf7-form-control wpcf7-text wpcf7-validates-as-required\" aria-required=\"true\" aria-invalid=\"false\" placeholder=\"Your Name *\" value=\"\" type=\"text\" name=\"your-name\" \/><\/span>\n\t<\/p>\n<\/div>\n<div class=\"column one-second\">\n\t<p><span class=\"wpcf7-form-control-wrap\" data-name=\"your-company\"><input size=\"40\" maxlength=\"400\" class=\"wpcf7-form-control wpcf7-text wpcf7-validates-as-required\" aria-required=\"true\" aria-invalid=\"false\" placeholder=\"Company *\" value=\"\" type=\"text\" name=\"your-company\" \/><\/span>\n\t<\/p>\n<\/div>\n<div class=\"column one-second\">\n\t<p><span class=\"wpcf7-form-control-wrap\" data-name=\"your-email\"><input size=\"40\" maxlength=\"400\" class=\"wpcf7-form-control wpcf7-email wpcf7-validates-as-required wpcf7-text wpcf7-validates-as-email\" aria-required=\"true\" aria-invalid=\"false\" placeholder=\"Business Email *\" value=\"\" type=\"email\" name=\"your-email\" \/><\/span>\n\t<\/p>\n<\/div>\n<div class=\"column one-second\">\n\t<p><span class=\"wpcf7-form-control-wrap\" data-name=\"your-phone\"><input size=\"40\" maxlength=\"400\" class=\"wpcf7-form-control wpcf7-tel wpcf7-validates-as-required wpcf7-text wpcf7-validates-as-tel\" aria-required=\"true\" aria-invalid=\"false\" placeholder=\"Phone \/ WhatsApp *\" value=\"\" type=\"tel\" name=\"your-phone\" \/><\/span>\n\t<\/p>\n<\/div>\n<div class=\"column one-second\">\n\t<p><span class=\"wpcf7-form-control-wrap\" data-name=\"your-country\"><input size=\"40\" maxlength=\"400\" class=\"wpcf7-form-control wpcf7-text\" aria-invalid=\"false\" placeholder=\"\u0421\u0442\u0440\u0430\u043d\u0430\" value=\"\" type=\"text\" name=\"your-country\" \/><\/span>\n\t<\/p>\n<\/div>\n<div class=\"column one-second\">\n\t<p><span class=\"wpcf7-form-control-wrap\" data-name=\"your-product\"><select class=\"wpcf7-form-control wpcf7-select wpcf7-validates-as-required\" aria-required=\"true\" aria-invalid=\"false\" name=\"your-product\"><option value=\"\">Product of Interest *<\/option><option value=\"Ship Launching Airbags\">\u041f\u043e\u0434\u0443\u0448\u043a\u0438 \u0431\u0435\u0437\u043e\u043f\u0430\u0441\u043d\u043e\u0441\u0442\u0438 \u0434\u043b\u044f \u0437\u0430\u043f\u0443\u0441\u043a\u0430 \u0441\u0443\u0434\u043e\u0432<\/option><option value=\"Pneumatic Fenders\">\u041f\u043d\u0435\u0432\u043c\u0430\u0442\u0438\u0447\u0435\u0441\u043a\u0438\u0435 \u043a\u0440\u044b\u043b\u044c\u044f<\/option><option value=\"Foam Filled Fenders\">\u041a\u0440\u044b\u043b\u044c\u044f, \u0437\u0430\u043f\u043e\u043b\u043d\u0435\u043d\u043d\u044b\u0435 \u043f\u0435\u043d\u043e\u0439<\/option><option value=\"Rubber Fenders (Arch \/ Cell \/ Cone)\">Rubber Fenders (Arch \/ Cell \/ Cone)<\/option><option value=\"Mooring Equipment (Anchor &amp; Chain)\">Mooring Equipment (Anchor &amp; Chain)<\/option><option value=\"Floating Modules \/ Buoys\">Floating Modules \/ Buoys<\/option><option value=\"Bridge Protection Equipment\">Bridge Protection Equipment<\/option><option value=\"Other \/ Customized\">Other \/ Customized<\/option><\/select><\/span>\n\t<\/p>\n<\/div>\n<div class=\"column one-second\">\n\t<p><span class=\"wpcf7-form-control-wrap\" data-name=\"your-application\"><select class=\"wpcf7-form-control wpcf7-select wpcf7-validates-as-required\" aria-required=\"true\" aria-invalid=\"false\" name=\"your-application\"><option value=\"\">Application *<\/option><option value=\"Ship Launching \/ Caisson Moving\">Ship Launching \/ Caisson Moving<\/option><option value=\"Port &amp; Terminal Berthing\">Port &amp; Terminal Berthing<\/option><option value=\"Ship-to-Ship (STS) Operation\">Ship-to-Ship (STS) Operation<\/option><option value=\"Offshore \/ Floating Projects\">Offshore \/ Floating Projects<\/option><option value=\"Bridge Protection\">Bridge Protection<\/option><option value=\"Aquaculture \/ Buoyancy\">Aquaculture \/ Buoyancy<\/option><option value=\"Other\">Other<\/option><\/select><\/span>\n\t<\/p>\n<\/div>\n<div class=\"column one-second\">\n\t<p><span class=\"wpcf7-form-control-wrap\" data-name=\"your-timeline\"><select class=\"wpcf7-form-control wpcf7-select\" aria-invalid=\"false\" name=\"your-timeline\"><option value=\"\">Procurement Timeframe<\/option><option value=\"Immediate\">Immediate<\/option><option value=\"Within 1 Month\">Within 1 Month<\/option><option value=\"1-3 Months\">1-3 Months<\/option><option value=\"3-6 Months\">3-6 Months<\/option><option value=\"Just Researching\">Just Researching<\/option><\/select><\/span>\n\t<\/p>\n<\/div>\n<div class=\"column one\">\n\t<p><span class=\"wpcf7-form-control-wrap\" data-name=\"your-message\"><textarea cols=\"40\" rows=\"3\" maxlength=\"2000\" class=\"wpcf7-form-control wpcf7-textarea\" aria-invalid=\"false\" placeholder=\"Detailed Requirements (size, quantity, delivery port, applicable standard)\" name=\"your-message\"><\/textarea><\/span>\n\t<\/p>\n<\/div>\n<input class=\"wpcf7-form-control wpcf7-hidden\" value=\"NANHAI Website Inquiry\" type=\"hidden\" name=\"your-subject\" \/>\n<div class=\"column one\">\n\t<p><div class=\"nanhai-cf7-turnstile\"><div class=\"cf-turnstile\" data-sitekey=\"0x4AAAAAAFAhzr1r7CIYTBZE\" data-theme=\"light\" data-size=\"flexible\"><\/div><p class=\"nanhai-turnstile-note\">Protected by Cloudflare Turnstile.<\/p><\/div><input class=\"wpcf7-form-control wpcf7-submit has-spinner\" type=\"submit\" value=\"Request a Quote\" \/>\n\t<\/p>\n<\/div><div class=\"wpcf7-response-output\" aria-hidden=\"true\"><\/div>\n<input type=\"hidden\" name=\"trp-form-language\" value=\"ru\"\/><\/form>\n<\/div>\n<\/div>\n        <p class=\"nb-form-note\">Your details are used to respond to this engineering request. For urgent tenders, email <a href=\"mailto:info@airbag.cc\">info@airbag.cc<\/a>.<\/p>\n      <\/div>\n    <\/div>\n  <\/section>\n\n  <section class=\"nb-resources\" aria-labelledby=\"nb-resources-title\">\n    <div class=\"nb-container\">\n      <div class=\"nb-resources__heading\">\n        <p class=\"nb-eyebrow\"><span><\/span> Related engineering resources<\/p>\n        <h2 id=\"nb-resources-title\">Continue the technical review.<\/h2>\n      <\/div>\n      <div class=\"nb-resources__grid\">\n        <a href=\"https:\/\/www.airbag.cc\/ru\/bridge-protection-engineering\/\"><span>Bridge protection hub<\/span><strong>Explore systems, equipment and project references<\/strong><i aria-hidden=\"true\">\u2192<\/i><\/a>\n        <a href=\"https:\/\/www.airbag.cc\/ru\/bridge-protection-engineering-bridge-barrier-system\/\"><span>Bridge barrier system<\/span><strong>Review the barrier architecture and application scope<\/strong><i aria-hidden=\"true\">\u2192<\/i><\/a>\n        <a href=\"https:\/\/www.airbag.cc\/ru\/self-floating-steel-clad-composite-bridge-anti-collision-facility\/\"><span>Self-floating composite facility<\/span><strong>See the steel-clad floating anti-collision solution<\/strong><i aria-hidden=\"true\">\u2192<\/i><\/a>\n      <\/div>\n    <\/div>\n  <\/section>\n<\/div>","protected":false},"excerpt":{"rendered":"","protected":false},"author":1,"featured_media":0,"parent":3545,"menu_order":0,"comment_status":"closed","ping_status":"closed","template":"nanhai-bridge-landing.php","meta":{"footnotes":""},"class_list":["post-6633","page","type-page","status-publish","hentry"],"yoast_head":"<!-- This site is optimized with the Yoast SEO Premium plugin v25.7.1 (Yoast SEO v28.7) - https:\/\/yoast.com\/product\/yoast-seo-premium-wordpress\/ -->\n<title>Cross-Sea Bridge Anti-Collision Systems | NANHAI MARINE<\/title>\n<meta name=\"description\" content=\"Engineered vessel anti-collision protection for 100,000-DWT fairways, approach spans and artificial-island transitions. Review the HZMB reference and request project sizing.\" \/>\n<meta name=\"robots\" content=\"index, follow, max-snippet:-1, max-image-preview:large, max-video-preview:-1\" \/>\n<link rel=\"canonical\" href=\"https:\/\/www.airbag.cc\/ru\/bridge-protection-engineering\/cross-sea-bridge-anti-collision-system\/\" \/>\n<meta property=\"og:locale\" content=\"ru_RU\" \/>\n<meta property=\"og:type\" content=\"article\" \/>\n<meta property=\"og:title\" content=\"Cross-Sea Bridge Vessel Anti-Collision Systems\" \/>\n<meta property=\"og:description\" content=\"Engineered vessel anti-collision protection for 100,000-DWT fairways, approach spans and artificial-island transitions. Review the HZMB reference and request project sizing.\" \/>\n<meta property=\"og:url\" content=\"https:\/\/www.airbag.cc\/ru\/bridge-protection-engineering\/cross-sea-bridge-anti-collision-system\/\" \/>\n<meta property=\"og:site_name\" content=\"NANHAI Marine\" \/>\n<meta property=\"article:publisher\" content=\"https:\/\/www.facebook.com\/nanhaimarine\/\" \/>\n<meta name=\"twitter:card\" content=\"summary_large_image\" \/>\n<script type=\"application\/ld+json\" class=\"yoast-schema-graph\">{\"@context\":\"https:\\\/\\\/schema.org\",\"@graph\":[{\"@type\":\"WebPage\",\"@id\":\"https:\\\/\\\/www.airbag.cc\\\/bridge-protection-engineering\\\/cross-sea-bridge-anti-collision-system\\\/\",\"url\":\"https:\\\/\\\/www.airbag.cc\\\/bridge-protection-engineering\\\/cross-sea-bridge-anti-collision-system\\\/\",\"name\":\"Cross-Sea Bridge Anti-Collision Systems | NANHAI MARINE\",\"isPartOf\":{\"@id\":\"https:\\\/\\\/www.airbag.cc\\\/#website\"},\"datePublished\":\"2026-11-03T06:01:59+00:00\",\"description\":\"Engineered vessel anti-collision protection for 100,000-DWT fairways, approach spans and artificial-island transitions. Review the HZMB reference and request project sizing.\",\"breadcrumb\":{\"@id\":\"https:\\\/\\\/www.airbag.cc\\\/bridge-protection-engineering\\\/cross-sea-bridge-anti-collision-system\\\/#breadcrumb\"},\"inLanguage\":\"ru-RU\",\"potentialAction\":[{\"@type\":\"ReadAction\",\"target\":[\"https:\\\/\\\/www.airbag.cc\\\/bridge-protection-engineering\\\/cross-sea-bridge-anti-collision-system\\\/\"]}]},{\"@type\":\"BreadcrumbList\",\"@id\":\"https:\\\/\\\/www.airbag.cc\\\/bridge-protection-engineering\\\/cross-sea-bridge-anti-collision-system\\\/#breadcrumb\",\"itemListElement\":[{\"@type\":\"ListItem\",\"position\":1,\"name\":\"\u9996\u9875\",\"item\":\"https:\\\/\\\/www.airbag.cc\\\/\"},{\"@type\":\"ListItem\",\"position\":2,\"name\":\"BRIDGE PROTECTION ENGINEERING\",\"item\":\"https:\\\/\\\/www.airbag.cc\\\/bridge-protection-engineering\\\/\"},{\"@type\":\"ListItem\",\"position\":3,\"name\":\"Cross-Sea Bridge Vessel Anti-Collision Systems\"}]},{\"@type\":\"WebSite\",\"@id\":\"https:\\\/\\\/www.airbag.cc\\\/#website\",\"url\":\"https:\\\/\\\/www.airbag.cc\\\/\",\"name\":\"NANHAI Marine\",\"description\":\"Marine Airbags &amp; Pneumatic Fenders Manufacturer since 2006\",\"publisher\":{\"@id\":\"https:\\\/\\\/www.airbag.cc\\\/#organization\"},\"potentialAction\":[{\"@type\":\"SearchAction\",\"target\":{\"@type\":\"EntryPoint\",\"urlTemplate\":\"https:\\\/\\\/www.airbag.cc\\\/?s={search_term_string}\"},\"query-input\":{\"@type\":\"PropertyValueSpecification\",\"valueRequired\":true,\"valueName\":\"search_term_string\"}}],\"inLanguage\":\"ru-RU\"},{\"@type\":\"Organization\",\"@id\":\"https:\\\/\\\/www.airbag.cc\\\/#organization\",\"name\":\"Shandong NANHAI Airbag Engineering Co., Ltd\",\"url\":\"https:\\\/\\\/www.airbag.cc\\\/\",\"logo\":{\"@type\":\"ImageObject\",\"inLanguage\":\"ru-RU\",\"@id\":\"https:\\\/\\\/www.airbag.cc\\\/#\\\/schema\\\/logo\\\/image\\\/\",\"url\":\"https:\\\/\\\/www.airbag.cc\\\/wp-content\\\/uploads\\\/2021\\\/10\\\/NANHAI-logo-250100.png\",\"contentUrl\":\"https:\\\/\\\/www.airbag.cc\\\/wp-content\\\/uploads\\\/2021\\\/10\\\/NANHAI-logo-250100.png\",\"width\":250,\"height\":100,\"caption\":\"Shandong NANHAI Airbag Engineering Co., Ltd\"},\"image\":{\"@id\":\"https:\\\/\\\/www.airbag.cc\\\/#\\\/schema\\\/logo\\\/image\\\/\"},\"sameAs\":[\"https:\\\/\\\/www.facebook.com\\\/nanhaimarine\\\/\"]}]}<\/script>\n<!-- \/ Yoast SEO Premium plugin. -->","yoast_head_json":{"title":"Cross-Sea Bridge Anti-Collision Systems | NANHAI MARINE","description":"Engineered vessel anti-collision protection for 100,000-DWT fairways, approach spans and artificial-island transitions. Review the HZMB reference and request project sizing.","robots":{"index":"index","follow":"follow","max-snippet":"max-snippet:-1","max-image-preview":"max-image-preview:large","max-video-preview":"max-video-preview:-1"},"canonical":"https:\/\/www.airbag.cc\/ru\/bridge-protection-engineering\/cross-sea-bridge-anti-collision-system\/","og_locale":"ru_RU","og_type":"article","og_title":"Cross-Sea Bridge Vessel Anti-Collision Systems","og_description":"Engineered vessel anti-collision protection for 100,000-DWT fairways, approach spans and artificial-island transitions. Review the HZMB reference and request project sizing.","og_url":"https:\/\/www.airbag.cc\/ru\/bridge-protection-engineering\/cross-sea-bridge-anti-collision-system\/","og_site_name":"NANHAI Marine","article_publisher":"https:\/\/www.facebook.com\/nanhaimarine\/","twitter_card":"summary_large_image","schema":{"@context":"https:\/\/schema.org","@graph":[{"@type":"WebPage","@id":"https:\/\/www.airbag.cc\/bridge-protection-engineering\/cross-sea-bridge-anti-collision-system\/","url":"https:\/\/www.airbag.cc\/bridge-protection-engineering\/cross-sea-bridge-anti-collision-system\/","name":"Cross-Sea Bridge Anti-Collision Systems | NANHAI MARINE","isPartOf":{"@id":"https:\/\/www.airbag.cc\/#website"},"datePublished":"2026-11-03T06:01:59+00:00","description":"Engineered vessel anti-collision protection for 100,000-DWT fairways, approach spans and artificial-island transitions. Review the HZMB reference and request project sizing.","breadcrumb":{"@id":"https:\/\/www.airbag.cc\/bridge-protection-engineering\/cross-sea-bridge-anti-collision-system\/#breadcrumb"},"inLanguage":"ru-RU","potentialAction":[{"@type":"ReadAction","target":["https:\/\/www.airbag.cc\/bridge-protection-engineering\/cross-sea-bridge-anti-collision-system\/"]}]},{"@type":"BreadcrumbList","@id":"https:\/\/www.airbag.cc\/bridge-protection-engineering\/cross-sea-bridge-anti-collision-system\/#breadcrumb","itemListElement":[{"@type":"ListItem","position":1,"name":"\u9996\u9875","item":"https:\/\/www.airbag.cc\/"},{"@type":"ListItem","position":2,"name":"BRIDGE PROTECTION ENGINEERING","item":"https:\/\/www.airbag.cc\/bridge-protection-engineering\/"},{"@type":"ListItem","position":3,"name":"Cross-Sea Bridge Vessel Anti-Collision Systems"}]},{"@type":"WebSite","@id":"https:\/\/www.airbag.cc\/#website","url":"https:\/\/www.airbag.cc\/","name":"NANHAI Marine","description":"Marine Airbags &amp; Pneumatic Fenders Manufacturer since 2006","publisher":{"@id":"https:\/\/www.airbag.cc\/#organization"},"potentialAction":[{"@type":"SearchAction","target":{"@type":"EntryPoint","urlTemplate":"https:\/\/www.airbag.cc\/?s={search_term_string}"},"query-input":{"@type":"PropertyValueSpecification","valueRequired":true,"valueName":"search_term_string"}}],"inLanguage":"ru-RU"},{"@type":"Organization","@id":"https:\/\/www.airbag.cc\/#organization","name":"\u0428\u0430\u043d\u044c\u0434\u0443\u043d NANHAI Airbag Engineering Co., Ltd","url":"https:\/\/www.airbag.cc\/","logo":{"@type":"ImageObject","inLanguage":"ru-RU","@id":"https:\/\/www.airbag.cc\/#\/schema\/logo\/image\/","url":"https:\/\/www.airbag.cc\/wp-content\/uploads\/2021\/10\/NANHAI-logo-250100.png","contentUrl":"https:\/\/www.airbag.cc\/wp-content\/uploads\/2021\/10\/NANHAI-logo-250100.png","width":250,"height":100,"caption":"Shandong NANHAI Airbag Engineering Co., Ltd"},"image":{"@id":"https:\/\/www.airbag.cc\/#\/schema\/logo\/image\/"},"sameAs":["https:\/\/www.facebook.com\/nanhaimarine\/"]}]}},"_links":{"self":[{"href":"https:\/\/www.airbag.cc\/ru\/wp-json\/wp\/v2\/pages\/6633","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/www.airbag.cc\/ru\/wp-json\/wp\/v2\/pages"}],"about":[{"href":"https:\/\/www.airbag.cc\/ru\/wp-json\/wp\/v2\/types\/page"}],"author":[{"embeddable":true,"href":"https:\/\/www.airbag.cc\/ru\/wp-json\/wp\/v2\/users\/1"}],"replies":[{"embeddable":true,"href":"https:\/\/www.airbag.cc\/ru\/wp-json\/wp\/v2\/comments?post=6633"}],"version-history":[{"count":0,"href":"https:\/\/www.airbag.cc\/ru\/wp-json\/wp\/v2\/pages\/6633\/revisions"}],"up":[{"embeddable":true,"href":"https:\/\/www.airbag.cc\/ru\/wp-json\/wp\/v2\/pages\/3545"}],"wp:attachment":[{"href":"https:\/\/www.airbag.cc\/ru\/wp-json\/wp\/v2\/media?parent=6633"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}