Pre-STS Operation Safety Checks

Safety Equipment

  • Personal Protective Equipment (PPE): Ensure that all personnel involved in the operation wear the necessary PPE, such as life jackets, helmets, gloves, safety boots, and coveralls.
  • Firefighting Equipment: Confirm the availability of firefighting equipment on both vessels, including fire hoses, foam systems, and portable extinguishers.
  • Safety Ropes and Lifebuoys: Ensure that appropriate ropes and lifebuoys are readily available.

Fendering and Mooring

  • Positioning of Fenders: Place fenders at the appropriate locations on both vessels to prevent damage during contact.
  • Mooring Lines: Rig mooring lines securely to ensure that the vessels are firmly held together during the transfer. Lines should be of adequate strength, and back-up lines should be ready.

Transfer Plan

  • Cargo Handling Equipment Check: Verify the proper functioning of the equipment for cargo transfer, such as hoses, pumps, and loading arms.
  • Dangerous Goods Assessment: For hazardous cargo, ensure that the appropriate handling procedures and safety measures are in place.